Apply to clean, moisture-free surface. Areas not requiring coating should be masked. Application: Coating may be applied by spraying, brushing, dipping or flow coating. Allow coating to flow around components. Cure: Room temperature cure: A 1.0 mil coating will be tack-free in 30 minutes. Full cure requires 24 hours @ 77˚F (25˚C). Heat cure: 8 hours @ 170˚F (77˚C). An open vessel of water placed in the drying chamber will facilitate curing. UV detectable for QC inspection. Removal: Coating may be removed by soaking in Electro-Wash® Two Step Cleaner Degreaser. Use CircuitWorks® Conformal Coating Remover Pen for spot removal. After the new component is installed, areas should be cleaned and recoated.